LEDs and connectors
3.3 Electrical connections
CP 1243-1 DNP3, CP 1243-1 IEC
22 Operating Instructions, 02/2014, C79000-G8976-C312-02
DIAG
(red / green)
-
LINK
(green)
CONNECT
(green)
VPN
(green)
SERVICE
(green)
Meaning
(if more than one point listed: alternative
meaning)
flashing red
-
- - Missing STEP 7 project data
flashing red
- - Backplane bus error
Connection to Industrial Ethernet
-
- - - Connection to Industrial Ethernet exists
green
- - -
Connection to Industrial Ethernet being
established.
IP address being obtained.
-
- - - No connection to Industrial Ethernet
Connection to communications partners
green
- - Connection established to at least one
partner
green
- - Partner reachable, CPU in STOP mode
flashing
green
- - Partner not reachable, CPU in RUN mode
flashing
green
- - Partner not reachable, CPU in STOP mode
Connection for online functions
green
- -
Connection for online functions established
green
- -
Attempt to establish connection for online
functions
green
- - -
No connection to engineering station
Loading firmware
Loading firmware. The DIAG LED flashes
alternating red and green.
flashing
green
Firmware was successfully loaded.
flashing red
Error loading firmware

Table of Contents

Other manuals for Siemens SIMATIC NET S7-1200

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens SIMATIC NET S7-1200 and is the answer not in the manual?

Siemens SIMATIC NET S7-1200 Specifications

General IconGeneral
BrandSiemens
ModelSIMATIC NET S7-1200
CategorySwitch
LanguageEnglish

Related product manuals