Phase 1 / 7. Server_2: Check and save the "Redundancy" dialog box
Open the "Redundancy" editor and check the settings in the dialog box. Click "OK" to exit
the dialog box even if you have made no changes.
Phase 1 / 8. Server_2: Check and save the "Time Synchronization" dialog box
Open the "Time Synchronization" editor and check the settings in the dialog box. Click "OK"
to exit the dialog box even if you have made no changes.
Phase 1 / 9. Client_2: Deactivate process mode and exit WinCC
Deactivate the process mode on all clients where Server_2 is set up as preferred server.
Note
In WinCC Explorer (Server data), you can activate Server_1 for operation as preferred
server for Client_2 within the phases 1 and 2. This setting retains operability of the clients.
Phase 1 / 10. Server_2: Activate WinCC Runtime
Activate WinCC Runtime on Server_2.
The system reacts as follows:
There is no server switchover. Depending on the configuration, the activated Server_2
becomes the standby or master server.
All OS clients still receive their visualization data from OS server Server_1, which has
not yet been updated.
Note
If a Process Historian is used in the project ensure the following:
The Process Historian was updated before
The Process Historian is in the "Active" state.
"PH-Ready Configuration" was done after update-/new- installation at Server_2.
Phase 1 / 11. Other redundant OS server pairs: Repeat steps 1 to 10
If you are using more than one redundant OS server pair, you must first update standby
server Server_2 for each.
Carry out the Phase 1 steps 1 through 10 for each Server_2.
Note
Migration of the central archive server (CAS) on the Process Historian
You can find more information about this in the "WinCC Classic Information System".
Result after Phase 1
Server_2 is updated and not connected to any OS clients.
Server_1 is the master server in the PCS 7 project being updated.
Failure, switchover and reintegration of high availability components
7.10 Guide to updating a redundant OS in runtime
High Availability Process Control Systems (V9.0)
226 Function Manual, 05/2017, A5E39221836-AA