Note that Windows administration of PCs should be performed by a Windows administrator.
You can find a detailed description of the PCS 7 installation and the required PCS 7-specific
settings for PC stations in the manual
Process Control System PCS 7; PCS 7 PC
Configuration
.
Phase 5 / 5. Server_1: If you want to use encrypted communication after the software update:
Activate "Encrypted communication" with migration mode. You can find information about this
in the documentation
Process Control System PCS 7; PCS 7 PC Configuration
.
Phase 5 / 6. ES: Download OS connection data and OS target system
Open NetPro and download the connection data from the ES to Server_1.
Right-click on the OS to be transferred in the open PCS 7 project below the WinCC
application. Select the menu command PLC > Download in the shortcut menu. This starts
the transfer from the ES to Server_1.
Phase 5 / 7. Server_1: Start WinCC
Start WinCC on Server_1.
Phase 5 / 8. Server_1: Check and save the "Redundancy" dialog box
Open the "Redundancy" editor and check the settings in the dialog box. Click "OK" to exit
the dialog box even if you have made no changes.
Phase 5 / 9. Server_1: Check and save the "Time Synchronization" dialog box
Open the "Time Synchronization" editor and check the settings in the dialog box. Click "OK"
to exit the dialog box even if you have made no changes.
Phase 5 / 10. Server_1: Activate WinCC Runtime
Activate WinCC Runtime on Server_1.
Note
If a Process Historian is used in the project make sure:
The Process Historian was updated before
The Process Historian is in the "Active" state.
"PH-Ready Configuration" was done after update-/new- installation at Server_1.
Phase 5 / 11. Perform Phase 5: Steps 1 to 10
If you are using more than one redundant OS server pair, repeat steps of Phase 5 / step 1
through 10 for each Server_1.
Phase 5 / 12. ES: Starting SIMATIC PDM
Start the SIMATIC PDM on the ES, if installed.
The system reacts as follows:
Server_1 becomes standby server.
Failure, switchover and reintegration of high availability components
7.10 Guide to updating a redundant OS in runtime
High Availability Process Control Systems (V9.0)