EasyManua.ls Logo

Siemens SIMATIC TDC - Protective Ground

Siemens SIMATIC TDC
228 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and EMC guidelines
1.12 Protective ground
SIMATIC TDC hardware
28 System Manual, 08/2017, A5E01114865-AL
1.12
Protective ground
Protective ground is bonded to the cabinets or components via PE conductor. It is required in
SIMATIC TDC for safe operation and as interference suppression measure.
The protective conductor must be routed and dimensioned in accordance with IEC 61131-2
(11.9).
Aotewell Ltd
www.aotewell.com
HongKong|UK|China
sales@aotewell.com
+86-755-8660-6182

Table of Contents

Related product manuals