EasyManuals Logo

Siemens SIMOTICS DC 1GG5 User Manual

Siemens SIMOTICS DC 1GG5
134 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
5.1.3 Testing the insulation resistance and polarization index........................................................34
5.1.4 Preparing the mating faces....................................................................................................37
5.2 Lift the machine to where it will be installed, and position it...................................................37
5.2.1 Preconditions for correct alignment and secure attachment .................................................37
5.2.2 Checking the load handling attachments...............................................................................38
5.2.3 Removing the rotor shipping brace........................................................................................38
5.2.4 Removing anti-corrosion protection.......................................................................................39
5.2.5 Mounting the output elements................................................................................................40
5.2.6 Lifting and transporting the machine......................................................................................41
5.2.7 Putting the machine down......................................................................................................43
5.2.8 Drain condensate...................................................................................................................43
5.2.9 Roughly aligning the machine................................................................................................43
5.3 Installing the machine............................................................................................................44
5.3.1 Safety instructions for installation...........................................................................................44
5.3.2 Selecting fixing screws...........................................................................................................45
5.3.3 Preconditions for smooth, vibration-free operation................................................................45
5.3.4 Aligning the machine to the driven machine and attaching it to it (foundation mounting) ......45
5.3.5 Aligning the machine to the driven machine and attaching it to it (flange mounting,
vertical)...................................................................................................................................47
5.3.6 Aligning the machine to the driven machine and mounting (flange, horizontal IM B5)..........47
5.3.7 Mounting the machine............................................................................................................48
5.3.8 Axial and radial forces............................................................................................................48
5.4 Ensuring cooling by means of external fans..........................................................................49
6 Electrical connection...................................................................................................................................51
6.1 Selecting cables.....................................................................................................................51
6.2 Bringing in and routing the cables..........................................................................................51
6.3 Terminal designations............................................................................................................52
6.4 Connecting cables..................................................................................................................52
6.5 Connecting the main circuit....................................................................................................53
6.6 Connecting the grounding conductor.....................................................................................55
6.7 Internal equipotential bonding................................................................................................56
6.8 Connecting the auxiliary circuits.............................................................................................56
6.9 Connecting an external fan motor..........................................................................................58
6.10 Connecting temperature monitoring for the stator winding....................................................58
6.11 Completing connection work..................................................................................................59
7 Commissioning...........................................................................................................................................61
7.1 Preparing for commissioning..................................................................................................61
7.2 Measure the insulation resistance before commissioning......................................................62
7.3 Greasing the roller bearings prior to commissioning..............................................................62
7.4 Minimum radial forces for cylindrical roller bearings..............................................................63
7.5 Commissioning an external fan..............................................................................................64
Table of contents
SIMOTICS DC 1GG5
6 Operating Instructions 02/2016

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens SIMOTICS DC 1GG5 and is the answer not in the manual?

Siemens SIMOTICS DC 1GG5 Specifications

General IconGeneral
BrandSiemens
ModelSIMOTICS DC 1GG5
CategoryEngine
LanguageEnglish

Related product manuals