EasyManua.ls Logo

Siemens SIMOTICS HV C - Page 6

Siemens SIMOTICS HV C
156 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.13.4 Checking the load handling attachments...............................................................................28
4.13.5 Lifting and transportation........................................................................................................29
4.13.6 Securing the rotor...................................................................................................................31
4.13.7 Working on the underside of the machine..............................................................................33
4.13.8 Storage...................................................................................................................................33
4.13.9 Storing machines together with the driven machine..............................................................35
4.13.10 Storage for longer than two years..........................................................................................37
4.13.11 Protection against corrosion...................................................................................................38
4.14 Converter operation...............................................................................................................38
4.14.1 Tandem operation..................................................................................................................38
5 Assembly....................................................................................................................................................39
5.1 Preparations for installation....................................................................................................40
5.1.1 Requirements for installation..................................................................................................40
5.1.2 Insulation resistance and polarization index..........................................................................40
5.1.3 Testing the insulation resistance and polarization index........................................................41
5.1.4 Prepare the mating faces for a flange connection..................................................................44
5.1.5 Do not bridge the bearing insulation......................................................................................44
5.2 Lift the machine to where it will be installed, and position it...................................................45
5.2.1 Checking the load handling attachments...............................................................................45
5.2.2 Preconditions for correct alignment and secure attachment .................................................45
5.2.3 Removing the rotor shipping brace........................................................................................46
5.2.4 Mounting the output elements................................................................................................47
5.2.5 Lifting the machine.................................................................................................................48
5.2.6 Working on the underside of the machine..............................................................................50
5.2.7 Removing anti-corrosion protection.......................................................................................50
5.2.8 Setting down the machine......................................................................................................51
5.3 Installing the machine............................................................................................................52
5.3.1 Safety instructions for installation...........................................................................................52
5.3.2 Selecting bolts........................................................................................................................52
5.3.3 Preconditions for smooth, vibration-free operation................................................................53
5.3.4 Recommended alignment accuracy.......................................................................................53
5.3.5 Aligning the machine to the driven machine and mounting it.................................................53
5.3.6 Axial and radial forces at the second shaft extension............................................................54
5.4 Complete the installation work...............................................................................................54
6 Electrical connection...................................................................................................................................55
6.1 Safety instructions..................................................................................................................55
6.2 Preparation.............................................................................................................................55
6.2.1 Selecting cables.....................................................................................................................55
6.2.2 Route the cable with an appropriate loop so that water can drip off......................................56
6.2.3 Terminal designation..............................................................................................................56
6.2.4 Routing the cable into the terminal box..................................................................................57
6.2.5 Terminal boxes with type of protection "Ex d/Ex db" .............................................................57
6.2.6 Terminal boxes with type of protection "Ex e/Ex eb" .............................................................58
6.2.7 Connecting the grounding conductor.....................................................................................59
6.3 Inserting and routing the cables.............................................................................................60
6.3.1 Connecting the machine for a specific direction of rotation....................................................60
6.3.2 Tightening torques for cable glands ......................................................................................61
Table of contents
SIMOTICS HV C 1NB1402-2AA84-4CA0-Z
6 Operating Instructions 06/2018

Table of Contents

Related product manuals