EasyManua.ls Logo

Siemens SIMOTICS HV C - Page 7

Siemens SIMOTICS HV C
156 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.3.3 Cable ends with wire end sleeves..........................................................................................62
6.3.4 Connecting aluminum conductors..........................................................................................63
6.3.5 Internal equipotential bonding................................................................................................63
6.3.6 Stepless mating face for sealing in the terminal box cover....................................................63
6.3.7 Finishing connection work......................................................................................................64
6.4 Connecting the auxiliary circuits.............................................................................................64
6.4.1 Selecting cables.....................................................................................................................64
6.4.2 Selecting cables.....................................................................................................................65
6.4.3 Bringing cables into the auxiliary terminal box and routing them...........................................65
6.4.4 Degree of protection of the auxiliary terminal box..................................................................66
6.4.5 Connecting temperature monitoring for the stator winding....................................................66
6.4.6 Intrinsically safe circuits for sensors or probes......................................................................66
6.4.7 Installing intrinsically safe circuits..........................................................................................67
6.4.8 Internal equipotential bonding in the auxiliary terminal box...................................................68
6.4.9 Terminating the connection work (auxiliary circuit)................................................................68
7 Commissioning...........................................................................................................................................69
7.1 Prior to commissioning ..........................................................................................................69
7.2 Insulation resistance and polarization index..........................................................................71
7.3 Greasing the roller bearings prior to commissioning..............................................................71
7.4 Test run..................................................................................................................................72
7.5 Overvoltages when switching high-voltage motors................................................................73
8 Operation....................................................................................................................................................75
8.1 Safety instructions for operation.............................................................................................75
8.2 Switching on with the anti-condensation heating active.........................................................77
8.3 Switching on the machine......................................................................................................77
8.4 Regreasing roller bearings.....................................................................................................77
8.5 Switching on again after an emergency switching-off............................................................78
8.6 Stoppages..............................................................................................................................78
8.6.1 Avoidance of condensation or formation of condensation within the machine.......................78
8.6.2 Avoidance of damage to roller bearings during stoppages....................................................79
8.6.3 Measuring the insulation resistance after an extended stoppage..........................................79
8.7 Decommissioning the machine..............................................................................................80
8.8 Re-commissioning the machine.............................................................................................80
8.9 Faults.....................................................................................................................................80
8.9.1 Inspections in the event of faults............................................................................................80
8.9.2 Electrical faults.......................................................................................................................81
8.9.3 Mechanical faults...................................................................................................................82
8.9.4 Roller bearing faults...............................................................................................................82
9 Maintenance...............................................................................................................................................85
9.1 Safety instructions for maintenance.......................................................................................85
9.2 Maintenance for machines with type of protection "Ex d/Ex db" ...........................................85
9.3 Inspection and maintenance..................................................................................................86
Table of contents
SIMOTICS HV C 1NB1402-2AA84-4CA0-Z
Operating Instructions 06/2018 7

Table of Contents

Related product manuals