Commissioning
4.2 Commissioning
FUT1010 IP65 NEMA 4X & IP66 NEMA 7 Liquid Quick Start
36 Operating Instructions, 1/2013, A5E02639182-AC
1. Apply power.
2. Within 10 seconds of power-up the main display will become active and a typical
Siemens graphic will appear briefly. The screen also identifies the software version of the
unit as shown below.
YHU
① Software operating system version
Figure 4-1 Splash Screen
3. The transmitter is ready to report flow. Press <MENU> key twice to display flow.
)$8/7
63$&(
0$.83
6LHPHQV 'XDO3DWK>@ 8QLW
)/2:*$/0,1
727$/ *$/ 9V
14.35
354.6597 14.27
100.0
0.0
31.74
9I