8.5.6 Priorities
The following 2 priorities apply to the step switch:
1 On / Off during the wiring test.
2 Demand-controlled by the sequence controller (preselection in normal
operation) and the external preselection (maximum selection)
8.5.7 Settings
Path: … > COMMIS > CONF > STEPLIN
Configuration
Display Name Range / comments
STEP 1 Step 1 Activation of step switch and selection of the
number of steps; adjustable values:---, Q1, Q2,
… (free outputs only)
STEP 2 Step 2 ---, Q1, Q2, … (free outputs only)
STEP 3 Step 3 ---, Q1, Q2, … (free outputs only)
STEP 4 Step 4 ---, Q1, Q2, … (free outputs only)
STEP 5 Step 5 ---, Q1, Q2, … (free outputs only)
STEP 6 Step 6 ---, Q1, Q2, … (free outputs only)
AO Modulating
output
---, Y1, Y2, … (free outputs only)
IN X Preselection
external
---, X1, X2, … (inputs with identifier % only)
Path: … > PARA > STEPLIN
Setting values
Display Name Range Factory setting
ON DLY Startup delay 00.00…10.00 m.s 00.00
PRIO CH Run priority changeover NO, YES NO
OFFTIME Locking time 00.00…10.00 m.s 00.00
MIN POS Positioning signal min 0…100 % 0 %
MAX POS Positioning signal max 0…100 % 100 %
INVERS Inversion NO, YES NO
Path: INFO
Display values
Display Name Comments
STEPLIN Linear step switch 0…100 %
STEP x Linear step switch, step x ON, OFF
Path: … > COMMIS > TEST
Wiring test
Display Name Positions
STEPLIN Linear step switch ---, 0…100 %
STEP x Linear step switch, step x ON, OFF
83 / 174
Siemens Universal Controllers RLU2… CE1P3101en
Building Technologies Aggregates 29.08.2008