Siemens Synco 200 User Manual

Siemens Synco 200
174 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
s
Synco
200
Universal Controllers RLU2…
Basic Documentation
Version 2.3
CE1P3101en
29.08.2008
Building Technologies

Table of Contents

Other manuals for Siemens Synco 200

Question and Answer IconNeed help?

Do you have a question about the Siemens Synco 200 and is the answer not in the manual?

Siemens Synco 200 Specifications

General IconGeneral
BrandSiemens
ModelSynco 200
CategoryController
LanguageEnglish

Summary

Overview

Important notes

Crucial safety, usage, and handling notes for the product.

Commissioning

Safety

Emphasizes that commissioning must be done by qualified personnel.

Entering commissioning mode

Describes how to enter the commissioning mode.

Selecting the basic configuration

Guides on choosing between basic types A or U for the controller.

Wiring test

Explains how to perform a wiring test for peripheral equipment.

Leaving commissioning

Describes the procedure for exiting commissioning mode and starting the plant.

Controller (CTLOOP x)

Controller configuration procedure

Outlines the major steps for configuring controllers.

Control strategies and setpoints for controller 1, basic type A

Details the available control strategies for controller 1 in basic type A.

Implementation: Room temperature control

Explains how to implement room temperature control.

Implementation: Room-supply air temperature cascade controller

Explains implementing cascade control for room-supply air temperature.

Implementation: Supply air temperature control

Explains the implementation of supply air temperature control.

Implementation: Room temperature control with supply air temperature limitation

Explains implementing room temperature control with supply air temperature limitation.

Control strategies and setpoints for universal controllers

Selecting the control strategy

Guides on selecting control strategies for universal controllers.

Changeover

Activating the controller with changeover

Explains activating changeover functions for universal controllers.

Sequence controllers, output assignments

Activating the function block

Explains activating the CTLOOPx sequence controller by assigning a main controlled variable.

Limitation, general (LIM)

Limitation of individual sequences (SEQLIM)

Purpose and activation

Explains the SEQLIM function for limiting individual sequences and its activation.

Frost protection (FROST)

Purpose and types of monitoring

Explains the FROST function for protecting air heating coils and monitoring types.

Operating principles and settings

Details the operating principles and actions of the DIG frost protection unit.

2-stage frost protection on the air side (DC 0…10 V)

Explains the 2-stage frost protection for air sides using DC 0-10 V signals.

2-stage frost protection on the water side (NI)

Explains the 2-stage frost protection for water sides using passive Ni1000 signals.

Acknowledgement / reset (AKN)

Help in the case of faults

Fault list

Provides a comprehensive list of possible faults, their causes, and priorities.