Instruction Manual LabScat 2 Commissioning
22 12112E/2
6 Commissioning
The initial start-up of the web user interface via the Ethernet interface is described in the
Reference Manual.
If malfunctions occur, consult the Section 10.
Proceed with the initial start-up in accordance with the following table:
Replace the desiccant according to Section 9.4
by the supplied new desiccant.
Check whether the water bath is connected
correctly. If this is OK, fill the water bath.
Section 4.2 and Section 4.3
3.1: Establish supply voltage to photometer
and then switch on the instrument. Welcome
screen appears on the display.
The factory setting language is English.
Accordingly, the displayed language during the
initial start-up is English. Section 5
3.2: Instrument carries out an internal func-
tional check.
3.3: The instrument is ready for measurement.
In the Logger/Data menu activate the Name.
Complete this step only if the
data should be identified in more
detail by means of a description
text.
Setting the date and time.