64 0608ME All Maintenance Manual
APPENDIX
Major Modification and Repair Record
Note:
1. A major modification/repair is a modification/repair of the entire machine or its components that affects the
stability, strength or performance of the machine.
2. A major modification/repair to the machine should be documented using the form below. This record should be
retained until the machine is taken out of service or as required by the machine owner/company.
3. The machine must be inspected and verified after major modifications/repairs, with the inspection items includ-
ing but not limited to all items in the Inspection and Preventative Maintenance Schedule. Once inspection and
verification are complete the machine can be put back into service.
12.2 INSPECTION AND PREVEN-
TIVE MAINTENANCE SCHEDULE
Perform inspection and preventive maintenance for the
items in the table below at the specified intervals. Main-
tenance and inspection intervals are calculated based
on the months of service or the “accumulated operating
hours” (cumulative working time) displayed on the
ground controls (whichever comes first).
Inspection intervals are based on the use of the ma-
chine under normal operating conditions. The intervals
should be shortened accordingly when operating in
harsh environmental conditions.
Table 12-1 Inspection and Preventive Maintenance Schedule
Item
Interval
Before each
delivery
1
or quarterly
2
Semiannually
3
Annually
4
Platform assembly
Platform 1 1 1
Guardrails and floor 2 2 2
Access gate
1, 2, 3 1, 2, 3 1, 2, 3
Pedal for platform extension
1, 2, 3 1, 2, 3 1, 2, 3
Platform wear pads (at the
connection with scissor arm) and
fasteners
1, 2 1, 2 1, 2
Safety belt anchorage point
1, 2, 7 1, 2, 7 1, 2, 7
Scissor arms assembly
Scissor arms
1, 2 1, 2 1, 2
Safety arm
1, 2, 3 1, 2, 3 1, 2, 3
Bearings
1, 2, 5, 11 1, 2, 5, 11 1, 2, 5, 8, 11
Pivot pins, retaining rings and
fasteners
1, 2 1, 2 1, 2
Chassis assembly
Chassis 2 2 2