- 14 -
951-171-016
Version 03
EN
1. Safety instructions
regulations and the local connection con-
ditions into account.
Do not touch cables or electrical compo-
nents with wet or damp hands.
Fuses must not be bypassed. Replace
defective fuses always by fuses of the
same type.
Undertake drilling at non-critical, non-
load bearing parts only. Use any available
boreholes. Do not damage lines and ca-
bles when drilling.
Observe possible abrasion points. Protect
the parts accordingly.
All components used must be designed
for:
- the maximum operating pressure
- the maximum/ minimum ambient
temperature
No parts of the centralized lubrication
system may be subjected to torsion,
shear, or bending.
Check all parts prior to their usage for
contamination and clean, if necessary.
Lubricant lines should be primed with
lubricant prior to installation. This makes
the subsequent ventilation of the system
easier.
Observe the specified tightening torques.
When tightening, use a calibrated torque
wrench.
When working with heavy parts use suit-
able lifting tools.
Avoid mixing up or wrong assembly
of dismantled parts. Mark these parts
accordingly.
1.19 Initial commissioning / daily start-up
Ensure that:
All safety devices are completely available
and functional
All connections are correctly connected
All parts are correctly installed
All warning labels on the product are
present completely, highly visible and
undamaged
Illegible or missing warning labels are to
be replaced without delay