Section 4 – Pre-operation Visual & Daily Maintenance Inspections
4.2-8 Platform assembly
Ensure there are no loose or missing parts and
there is no visible damage.
Ensure all fasteners are securely in place.
Ensure fall protection anchorage(s)
1
are
secure and there is no visible damage.
Ensure all railings
2
are properly positioned
and secured.
Ensure gates/drop bars
3
are in good
working order.
Ensure footswitch
4
is in good working
order and has not been modied, disabled or
blocked.
Ensure MEWP oor
5
is secure and there is
no visible damage.
5
Platform control console
Ensure all switches/controllers are returned to
neutral.
Ensure there are no loose or missing parts and
there is no visible damage.
6
Manuals
Ensure a copy of operating manual, and other
important documents are enclosed in manual
storage box.
1. Check to be sure manual storage box is
present and in good condition.
2. Ensure manuals are legible and in good
condition.
3. Always return manuals to the manual storage
box after use.
4
2
3
1
1
5
6
5

Table of Contents

Other manuals for Skyjack SJ85 AJ

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Skyjack SJ85 AJ and is the answer not in the manual?

Skyjack SJ85 AJ Specifications

General IconGeneral
BrandSkyjack
ModelSJ85 AJ
CategoryBoom Lifts
LanguageEnglish

Related product manuals