SMA Solar Technology AG Connecting External Sources
Technical Description SI5048-TB-TEN110340 115
Reaching the float charging process
If the float charging process (see section 13.4”Charge Control” (page99)) is activated
before the cutoff limit (GnSocTm1Stp or GnSocTm2Stp) is reached, the generator request
is disabled again. If a full or equalization charge is active, the generator is only stopped
after this charge is completed and not when "235.04 GnSocTm1Stp" or
"235.06 GnSocTm2Stp" is reached.