SMA Solar Technology AG Connecting External Sources
Technical Description SI5048-TB-TEN110340 115
Reaching the float charging process
If the float charging process (see section 13.4”Charge Control” (page99)) is activated
before the cutoff limit (GnSocTm1Stp or GnSocTm2Stp) is reached, the generator request
is disabled again. If a full or equalization charge is active, the generator is only stopped
after this charge is completed and not when "235.04 GnSocTm1Stp" or
"235.06 GnSocTm2Stp" is reached.