SMA Solar Technology AG Troubleshooting
Technical Description SI5048-TB-TEN110340 197
20.6 Events
The meanings of the events displayed by the Sunny Island are described in the following table:
20.6.1 Category INV
20.6.2 Category BAT
Display no. Description
E101 Wait status
E102 Startup process
E103 Operation
E104 Operating on the generator (at external input)
E105 Operating on the grid (at external input)
E106 Feeding-in grid operation (at external input)
E107 Sleep mode (slave in single-phase systems)
E108 Silent mode on the grid
E110 Shutting down due to fault
E115 Emergency charge
E118 Automatic start
E119 Manual start (transition from standby mode to operation)
E120 Manual stop (transition from operation to standby mode)
E129 External start (remote)
E130 External stop (remote)
E131 The AFC control engages
E132 The AFC control stops
Display no. Description
E202 (Partial) reset of BMS due to new battery
E203 State change, battery charging algorithm for float charge
E204 State change, battery charging algorithm for boost charge
E205 State change, battery charging algorithm for full charge
E206 State change into silent mode option
E207 State change, battery charging algorithm for equalization charge