Loading...
Status
Site
Production
90 kW
Limit
1.00 MW
Inverters
10/10
Inverter
SN 07318000C
Power
100 kW
Voltage
277 Vac
Frequency
60.9 Hz
P_OK: 31 0f 31
Optimizers Connected
S_OK
Server Connected
Status
Production
Switch
OFF
CosPhi
1.00
Limit
Export
Country
ITA
Switch Off. Production disabled
Commissioning
Site status:
Production: The AC output power
Limit: Limitation setting (Export or Production)
Inverters: Number of connected inverters in the cluster, including the
master.
Communication Status
This screen displays the status of connection option(s): LAN, RS485, Wi-Fi, cellular or
ZigBee Plug-in.
Chapter 5: Activating, Commissioning and Configuring the System Using the
Inverter SetApp 43