EasyManua.ls Logo

Sun Microsystems Sun Fire T1000 - 6 Finishing up Servicing; Final Service Procedures; Replacing the Top Cover; Reinstalling the Server Chassis in the Rack

Sun Microsystems Sun Fire T1000
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-1
CHAPTER
6
Finishing Up Servicing
This chapter describes how to finish up servicing the server.
The following topics are covered:
Section 6.1.1, “Replacing the Top Cover” on page 6-1
Section 6.1.2, “Reinstalling the Server Chassis in the Rack” on page 6-1
Section 6.1.3, “Applying Power to the Server” on page 6-2
6.1 Final Service Procedures
This section provides the finishing tasks in servicing your server.
6.1.1 Replacing the Top Cover
1. Place the top cover on the chassis.
Set the cover down so that the cover hangs over the rear of the server by about an
inch (2.5 cm).
2. Slide the cover forward until it latches into place.
6.1.2 Reinstalling the Server Chassis in the Rack
1. Refer to the Sun Fire T1000 Server Installation Guide for installation instructions.
2. After you have reinstalled the server chassis in the rack, reconnect all cables that
you disconnected when you removed the chassis from the rack.

Table of Contents

Related product manuals