5.2. Switching ON/OFF
Once the inverter has been correctly installed and the batteries have been connected,
press the ON/OFF button (located on the left side of the case) to activate the system.
When the system is connected without a battery but connected with either PV or grid
and the ON/OFF button is switched off, the LCD will still illuminate (display will show
off). In this condition, when switching on the ON/OFF button and selecting ‘No Battery’,
the system can still work.
5.3. Home Page
Press the Esc button in any page to access the Home Page:
What this page displays:
Total daily power into the battery (kWh).
Total daily power out of the battery (kWh).
SOC (State of charge of the battery) (%).
Total daily solar power produced in (kWh).
Total hourly usage of the generator (Time).
Total daily power sold to the grid (kWh).
Total daily power bought from the grid (kWh).
Real-time solar power in (kW).
Real-time load power in (kW).
1.
Customer name
2.
Access settings menu page
3.
Access solar history
4.
Access system status page
5.
Access system status page
6.
Access grid history
7.
Access system flow page
Real-time battery charge power
in (kW).
Real-time grid power in (kW).
Serial number.
Time date.
Fault condition.
Access stats pages.
Access status page.
Access fault diagnostic page.

Table of Contents

Other manuals for SunSynk SUN-10K-SG04LP3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SunSynk SUN-10K-SG04LP3 and is the answer not in the manual?

SunSynk SUN-10K-SG04LP3 Specifications

General IconGeneral
BrandSunSynk
ModelSUN-10K-SG04LP3
CategoryInverter
LanguageEnglish

Related product manuals