4E-70 ABS:
2 1) Remove the meter panel. Refer to “Meter Panel
Removal and Installation” in Section 9D in related
manual.
2) Check the ABS control unit coupler for loose or poor
contacts.
If OK, then disconnect the ABS control unit coupler.
Refer to “ABS Control Unit Coupler Disconnect and
Connect (AN400A/ZAK9)” (Page 4E-71).
3) Measure the voltage between “8” (R/Bl) and “24” (B/W)
at the coupler.
Special tool
(A): 09900–25008 (Multi circuit tester set)
Tester knob indication
Voltage ( )
Normal value (“8” – “24”)
Battery voltage (12.0 V and more)
ABS control unit coupler (Harness side)
Is the voltage between “8” and “24” normal?
Replace the ABS
control unit/HU.
Inspect the wire
harness. (Faulty
solenoid or ground wire)
Step Action Yes No
24 25
18
10
12 13
16
2
3
4
21
(ޓ)
89
(ޓ)
(A)
(A)
I718H1450096-02