EasyManua.ls Logo

Suzuki DF350A - Battery Installation; Battery Requirement

Suzuki DF350A
232 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
BATTERY INSTALLATION
BATTERY REQUIREMENT
1000 Marine Cranking Amps (MCA)/ABYC,
or 800 Cold Cranking Amps (CCA)/SAE
or 180 Reserve Capacity (RC) Minutes/SAE
NOTE:
The specifications listed above are the mini-
mum battery rating requirements for starting
the engine.
If your boat application requires additional
battery loads, it is recommended that an aux-
iliary battery or batteries be installed. Consult
your Suzuki dealer for proper battery installa-
tion information.
Dual-purpose (Cranking/Deep-cycle) batter-
ies can be used if they meet the minimum
specifications listed above (MCA, CCA, or
RC).
Do not use a Deep Cycle battery for the main
cranking battery.
When connecting batteries in parallel, they
must be of the same type, capacity, manufac-
turer, and of similar age. When replacement
is necessary, they should be replaced as a
set. Consult your Suzuki dealer for proper
battery installation information.
BATTERY INSTALLATION
Secure the battery in a dry area of the boat,
away from vibration.
NOTE:
It is recommended that the battery be
installed in an enclosed battery case.
When connecting batteries, hexagon-nuts
must be used to secure battery leads to bat-
tery posts.
To hook up the battery, first connect the red
lead from the motor to the positive battery ter-
minal, then connect the black lead to the nega-
tive battery terminal.
Red lead
Black
lead
Sub battery
cable
White lead
Hexagon-nut

Table of Contents

Other manuals for Suzuki DF350A

Related product manuals