EasyManua.ls Logo

Swann AMI INSPECTOR pH - Replacing the Battery

Swann AMI INSPECTOR pH
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
38 A-96.250.761 / 161017
AMI INSPECTOR pH
Maintenance
6.5.5 Completion of the measurement
1 Stop the sample flow to the AMI pH-Redox by closing the ap-
propriate valve, e.g. back pressure regulator, sample prepara-
tion or flow regulating valve at flow cell again.
2 Close flow regulating valve of the AMI Inspector pH.
3 Disconnect the AMI Inspector pH by removing the tubes and
connect the sample outlet of the Monitor AMI pH-Redox to the
sample outlet funnel again.
4 Start sample flow again and regulate sample flow.
5 Shutdown AMI Inspector pH.
If the instrument will not be used for a longer period of time, see
Longer Stop of Operation, S. 41.

Related product manuals