EasyManua.ls Logo

TA Instruments TGA 2950 - System Inspection and Setup

TA Instruments TGA 2950
264 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TA I
NSTRUMENTS
TGA 2950 27
Installing
the Instrument
Before shipment, the TGA 2950 instrument is
inspected both electrically and mechanically so
that it is ready for operation upon proper instal-
lation. Installation involves the following
procedures, described in this chapter:
· Inspecting the system for shipping damage
and missing parts
· Filling the heat exchanger
· Connecting the TGA to the TA Instruments
controller
· Connecting the heat exchanger cable and
water lines, purge gas lines, accessories, and
power cable
· Unpacking the balance
· Installing the hang-down wires
· Leveling the instrument and aligning the
hang-down wires
· Adjusting the sample platform.
If you wish to have your TGA installed by a TA
Instruments Service Representative, call for an
installation appointment when you receive your
instrument.
To avoid mistakes, read this entire chapter
before you begin installation.
Installing the Instrument
tt
tt
t
CAUTION:

Table of Contents

Related product manuals