TA I
NSTRUMENTS
TGA 2950 2–7
Installing
the Instrument
Before shipment, the TGA 2950 instrument is
inspected both electrically and mechanically so
that it is ready for operation upon proper instal-
lation. Installation involves the following
procedures, described in this chapter:
· Inspecting the system for shipping damage
and missing parts
· Filling the heat exchanger
· Connecting the TGA to the TA Instruments
controller
· Connecting the heat exchanger cable and
water lines, purge gas lines, accessories, and
power cable
· Unpacking the balance
· Installing the hang-down wires
· Leveling the instrument and aligning the
hang-down wires
· Adjusting the sample platform.
If you wish to have your TGA installed by a TA
Instruments Service Representative, call for an
installation appointment when you receive your
instrument.
To avoid mistakes, read this entire chapter
before you begin installation.
Installing the Instrument
tt
tt
t
CAUTION: