EasyManua.ls Logo

Takeuchi TB014 - Cold Weather Operation

Takeuchi TB014
214 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
84
OPERATION
Leveling
1. Bring the hoe attachment close to the
body.
2. Gradually remove the dirt from the side of
the mound.
3. Once the mound is low, remove the dirt
from the top. If the load on the body is too
heavy, adjust by raising or lowering the
dozer blade.
Operating Procedures
E4D053

Table of Contents

Related product manuals