EasyManua.ls Logo

Taylor C606 - Soft Lock Message Troubleshooting

Taylor C606
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
94
Model C606Operating Procedures
080716
Step 12
Grasp the pump tube by both ends and remove it
from the pump body. (See Figure 238.)
Figure 238
Step 13
Remove the clips from their respective collars.
Step 14
Remove the fittings from the pump tube.
Pump Tube Installation
Step 1
Lubricate the o-rings on the syrup line fittings with
Taylor Lube HP.
Figure 239
Step 2
Press the fittings into the new pump tube.
Step 3
Install the clips into their respective collars.
Step 4
Using your hands, rotate the pump rollers so they
are in the 10 and 2 o'clock position.
Step 5
Place the tube assembly into the pump body. (Make
sure the syrup lines are pushed through the rear of
the cabinet.)
Step 6
Push down on the top of the pump to close it.
Step 7
Replace the pump cover tray and the syrup
containers.
Step 8
Prime the syrup lines.
Step 9
Calibrate the syrup system according to the
instructions on page 78.
Syrup Line Cleaning/Sanitizing - Weekly
Step 1
Remove the pick up tubes from the syrup
containers. Wipe the outside of the tubes with a
clean, sanitized towel.
For Syrup Bag System: Disconnect each syrup
bag and clean the hose connector fitting with a
clean, sanitized towel.
Step 2
Prepare a pail of an approved 100 PPM cleaning
solution (examples: 2-1/2 gal. [9.5 liters] of Kay-5R
or 2 gal. [7.6 liters] of Stera-SheenR). USE WARM
WATER AND FOLLOW THE MANUFACTURER'S
SPECIFICATIONS. Place the pick up tubes in the
pail.
For Syrup Bag System: Place the syrup hose with
the bag connection fitting in the pail of approved 100
PPM cleaning solution (examples: Kay-5® or
Stera-Sheen®). USE WARM WATER AND FOL-
LOW THE MANUFACTURER'S SPECIFICATIONS.

Table of Contents

Related product manuals