EasyManua.ls Logo

Taylor C606 - Page 76

Taylor C606
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
70
Model C606Operating Procedures
041008
Step 13
With the syrup port brush, brush each syrup port
hole 10 to 15 times. Dip the brush in the cleaning
solution before brushing each port.
(See Figure 165.)
Figure 165
Step 14
With sanitized hands, remove the syrup valve
retainers. Brush clean the retainers and retainer
holes. Replace the syrup valve retainers.
Step 15
Fill the squeeze bottle with cleaning solution. With a
pail beneath the door, insert the tube end of the
squeeze bottle into the syrup ports, and squeeze the
bottle firmly. This action will force solution out of the
adjacent port and down around the spinner. This
procedure should be performed for at least 10
seconds per port. (See Figure 166.)
Figure 166
Step 16
Place the spout cap o-ring in the spout cap. Fill the
spout cap with sanitizing solution. Install the spout
cap over the end of the door spout.
(See Figure 167.)
Figure 167
Step 17
Raise each retainer pin. Install the syrup hole plugs
in the syrup ports in the freezer door. Lower the
retainer pins to secure the hole plugs in the door.
(See Figure 168.)
Figure 168

Table of Contents

Related product manuals