9 Performing the measurement
57
2
Start measurement: tap .
Zeroing takes place.
Readings are displayed.
If the Draught measurement parameter is enabled in the reading
display, a draught measurement is automatically started in parallel to
the flue gas measurement. In the List measurement data view, the
parallel draught measurement can be stopped/restarted. This draught
measurement is performed separately to a measurement of the
Draught measurement type.
For the draught measurement, the minus connection for differential
pressure measurement must be free (ambient pressure, not closed).
3
Tap on the draught reading display or next to it.
4
End measurement: tap .
Automatic display after connection of one or more Smart Probe testo 115i
or testo 915i during flue gas measurement
If several temperature probes are connected in total (external probes and/or
testo 115i or testo 915i), the temperature probes are used for flue gas
measurement according to the following procedure.
The AT probe = external cable probe always has first priority.