EasyManua.ls Logo

Toro 23518 - Tine Maintenance; Checking the Tines; Adjusting the Tine-Drive Chain

Toro 23518
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TineMaintenance
CheckingtheTines
ServiceInterval:Beforeeachuseordaily
1.Stoptheengine,settheparkingbrake,removethekey,
andwaitforallmovingpartstostopbeforeleavingthe
operatingposition.
2.Raisethemachineandsupportitwithjackstandswith
a460kg(1,015lb)capacity.
CAUTION
Raisingthemachineforserviceor
maintenancerelyingsolelyonmechanical
orhydraulicjackscouldbedangerous.The
mechanicalorhydraulicjacksmaynotbe
enoughsupportormaymalfunctionallowing
themachinetofall,whichcouldcauseinjury.
Donotrelysolelyonmechanicalorhydraulic
jacksforsupport.Useadequatejackstands
orequivalentsupport.
3.Removethe2bolt(3/8x1inch)and2washers(3/8
inch)thatsecuretherear-coverpaneltothechassis,
andremovethepanel(Figure66).
Figure66
1.Chassisholes3.Bolt(3/8x1inch)
2.Washer(3/8inch)
4.Rearpanel
4.Removerocksandotherdebrisfromthetines.
5.Inspectthetinesforwearanddamage.
Note:Replaceanytinesthatarewornordamaged.
6.Aligntheholesintherear-coverpaneltotheholesin
thechassis(Figure66).
7.Securethecoverpaneltothechassiswiththe2bolts
and2washers(Figure66)thatyouremovedinstep3,
andtorquetheboltsto37to45N-m(27to33lb-in)
AdjustingtheTine-DriveChain
1.Stoptheengine,settheparkingbrake,removethekey,
andwaitforallmovingpartstostopbeforeleavingthe
operatingposition.
2.Removetherearcover;refertostep3ofCheckingthe
Tines(page48).
3.Checkthechainsonbothsidesofthemachinefor
propertension.
Note:Thechainsshouldmoveupanddown6to12
mm(1/4to1/2inch).
4.Loosenthelocknutandcarriageboltthatsecurethe
idlersprocket(Figure67).
Figure67
1.Locknut
3.Carriagebolt
2.Idlersprocket
4.Slot(trailplate)
5.Increaseordecreasechaintensionbyperformingthe
following:
Pushdownandforwardonthesprockettoincrease
thechaintensionasshowninFigure67.
Liftupandbackonthesprockettodecreasethe
chaintension.
6.Torquethelocknutto91to113N-m(67to83ft-lb).
7.Checkthechaintensionandifnecessaryrepeatsteps4
through6untilyoucanmovethechainupanddown6
to12mm(1/4to1/2inch).
8.Installtherearpanel;refertosteps6and7ofChecking
theTines(page48).
48

Table of Contents

Other manuals for Toro 23518

Related product manuals