EasyManua.ls Logo

Toro Reelmaster 5010- H - Page 30

Toro Reelmaster 5010- H
335 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reelmaster 5010- HPage 3 - 12Kubota Diesel Engine
8. Connect air cleaner and motor/generator intake
hoses to fan shroud and secure with hose clamps (Fig.
9). Torque hose clamps from 30 to 40 in- lb (3.4 to 4.5
N- m).
9. Make sure radiator draincock is closed (threaded out
fully).
10.Fill radiator and coolant reservoir with coolant.
11. Lower and secure hood.
12.Carefully position and install oil cooler to radiator
frame. Rotate clamps to secure oil cooler to radiator
frame.
13.Install 12 volt battery (see 12 VDC Battery Service
in the Service and Repairs section of Chapter 5 - Electri-
cal System).
14.Install and latch rear screen.

Table of Contents

Other manuals for Toro Reelmaster 5010- H

Related product manuals