EasyManua.ls Logo

Toro Reelmaster 5010- H - Piston (Traction) Pump Flow Test

Toro Reelmaster 5010- H
335 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reelmaster 5010- HHydraulic System Page 4 - 40
Piston (Traction) Pump Flow Test (Using Tester with Flow Meter and Pressure Gauge)
Figure 37
FORWARD
M7
M6
FROM STEERING CONTROL VALVE
R9
INTERNAL
CASE
DRAIN
TRACTION
WHEEL
MOTORS
G5
G6
B
R5
R4
R3
A
B
A
B
LH RH
A
P3
TESTER
TO LIFT CONTROL MANIFOLD
TO STEERING CONTROL VALVE AND CHARGE CIRCUIT
100 MESH
SUCTION
STRAINER
P1
P2
Procedure for Piston (Traction) Pump Flow Test
This test measures piston (traction) pump output (flow).
During this test, pump load is created at the flow meter
using the adjustable load valve on the tester.
IMPORTANT: Traction circuit flow for your Reel-
master is approximately 30 GPM (113.5 LPM). Use 40
GPM Hydraulic Tester #AT40002 (pressure and flow)
for this test (see Special Tools in this chapter).
1. Parkmachineonalevelsurfacewiththecuttingunits
lowered and disengaged. Make sure engine is off. Apply
the parking brake. Make sure mow speed limiter is in the
transport position to allow full movement of traction ped-
al.
2. Read Precautions For Hydraulic Te sting in this sec-
tion.
CAUTION
Before opening hydraulic system, operate all hy-
draulic controls to relieve system pressure and
avoid injury from pressurized hydraulic oil. See
Relieving Hydraulic System Pressure in the Gen-
eral Information section of this chapter.
3. Make sure that traction pedal is adjusted to the neu-
tral position. Also, ensure that piston (traction) pump is
at full stroke when traction pedal is pushed into fully for-
ward position.
4. Raise and support machine so all wheels are off the
ground (see Jacking Instructions in Chapter 1 - Safety).

Table of Contents

Other manuals for Toro Reelmaster 5010- H

Related product manuals