RT-SVD03G-EN 53
ReliaTel Test Mode
Units with two heat exchangers (high heat models)
Heat Stage 1 - The 2 stage burner runs high heat for 60 seconds, then drops to low heat. Modulating
gas heat stays off.
Heat Stage 2 - The 2 stage burner stays on low. Modulating burner comes on and stays at 100%.
5
COOL
STAGE
1
IN CON-
TROL
ON(5) MIN OFF MIN ON(6) OFF OFF OFF 0% 100% 0% OFF(8) ON 10k
6
COOL
STAGE
2
IN CON-
TROL
ON(5) MIN OFF MIN OFF(4)
ON(4)
(6)
OFF OFF 0% 100% 0% ON(8) ON 15k
7
COOL
STAGE
3
IN CON-
TROL
ON MIN OFF MIN ON(6) ON(6) OFF OFF 0% 100% 0% ON(8) ON 22k
8
REHEAT
*
IN CON-
TROL
ON MIN OFF MIN ON(6) ON(6) OFF OFF 0% 50% 50% OFF ON 27k
9
HEAT
STAGE
1*
OPEN/
100%
(7)
ON(5) MIN OFF MIN OFF OFF
ON
(7)
OFF 50% 100% 0% OFF ON 33k
10
HEAT
STAGE
2*
OPEN/
100%
(7)
ON(5) MIN OFF MIN OFF OFF
ON
(7)
ON
(7)
100% 100% 0% OFF ON 47k
11 Reset
* With Optional Feature
1. The IGV/VFD will be controlled to the supply pressure setpoint unless test mode has been running for 6 minutes or longer. After 6 minutes, the IGV
damper will be allowed to drive to 100% for step 9 and 10.
2. The exhaust fan will turn on anytime the economizer damper position is equal to or greater than the exhaust fan setpoint. It will not turn off until the
economizer damper position is at Exhaust Enable Setpoint - 10% or lower.
3. The VHR relay output will be energized at the start of the test mode to allow time for the VAV boxes to open. It takes 6 minutes for the boxes to drive
from the full closed position to the full open position. The timing cannot be changed in the field.
4. 27.5-35 ton units have 2 stages of mechanical cooling. Both compressors run during cool stage 2.
5. The supply fan will not be allowed to go from an off state to an on state until the IGV are fully closed.
6. The condenser fans will operate any time a compressor is ON providing the outdoor air temperatures are within normal operating range.
7. The heat outputs will not be allowed to come on until the unit has been in test mode for at least 6 minutes and the IGV/VFD is at 100%.
8. The reheat pumpout output will be energized whenever the reheat circuit (circuit 2 for 40-50T) is energized for Cooling operation.
Steps for optional accessories and modes not present in unit will be skipped.
Table 16. Voyager Commercial VAV Service Test with Reheat and Statitrac
Table 17. CV Test Modes (Also VAV w/o IGV) 27 1/2 - 50 Ton without Reheat
TEST
STEP MODE SF Econ.*
EXH
FAN
(1)
*
POWER EXH
DAMPER* COMP 1 COMP 2 HEAT 1* HEAT 2*
MOD
HEAT* OHMS
1 MINIMUM VENTILATION ON Min OFF Min OFF OFF OFF OFF 0% 4.7k
2
ECONOMIZER TEST
OPEN
ON 100% ON 100% OFF OFF OFF OFF 0% 6.8k
3 COOL STAGE 1 ON Min OFF Min ON(2) OFF OFF OFF 0% 10k
4 COOL STAGE 2 ON Min OFF Min OFF(3) ON(2)(3) OFF OFF 0% 15k
5 COOL STAGE 3 ON Min OFF Min ON(2) ON(2) OFF OFF 0% 22k
6 HEAT STAGE 1 ON Min OFF Min OFF OFF ON OFF 50% 33k
7 HEAT STAGE 2 ON Min OFF Min OFF OFF ON ON 100% 47k
8 Reset
* With Optional Feature
1. The exhaust fan will turn on anytime the economizer damper position is equal to or greater than the exhaust fan setpoint. It will not turn off until the
economizer damper position is at Exhaust Enable Setpoint - 10% or lower.
2. The condenser fans will operate any time a compressor is ON providing the outdoor air temperatures are within normal operating range.
3. 27.5-35 ton units have 2 stages of mechanical cooling. Both compressors run during cool stage 2.
Steps for optional accessories and modes not present in unit will be skipped.