EasyManua.ls Logo

Trane Sintesis RTAF - Power Up to Starting

Trane Sintesis RTAF
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Start-Up and Shutdown
RTAF-SVX001A-EN 53
Power Up to Starting
Figure 44, p. 53 diagram shows the timing from a power
up event to energizing the first compressor.The shortest
allowable time would be under the following conditions:
No motor restart inhibit time left from subsequent
starts
Evaporator Water flow occurs quickly with pump on
command
Power up Start Delay set to 0 minutes
Need to cool (differential to start) already exists
Oil level is detected immediately
The above conditions would allow for a minimum power
up to starting the first compressor time of about 45
seconds (variations may exist due to options installed).
Note that it is not advisable to start a chiller “cold”, the oil
heaters should be in operation for a sufficient length of
time prior to first start. Consult the chillers IOM for
specifics.
Figure 44. Sequence of events: power up to starting

Table of Contents

Related product manuals