EasyManua.ls Logo

Vertiv CoolPhase CDU - Page 109

Vertiv CoolPhase CDU
157 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8. Check/Re-torque the wire connections.
9. Check the contactors for pitting (replace if pitted).
10. Verify the operation sequence/set points.
11. Charge verification:
a. Outdoor ambient temperature.
b. Subcooling
c. Indoor unit return air temperature
* Motor amp draw
#1 L1 L2 L3
#2 L1 L2 L3
#3 L1 L2 L3
#4 L1 L2 L3
#5 L1 L2 L3
#6 L1 L2 L3
#7 L1 L2 L3
#8 L1 L2 L3
#9 L1 L2 L3
#10 L1 L2 L3
#11 L1 L2 L3
#12 L1 L2 L3
#13 L1 L2 L3
#14 L1 L2 L3
#15 L1 L2 L3
#16 L1 L2 L3
Vertiv™ Liebert® EconoPhase Pumped Refrigerant Economizer
1. Check for refrigerant leaks.
2. Check/re-torque the wire connections.
3. Check the contactors for pitting (replace if pitted).
4. Verify the pump speed control operation.
5. Check the pump mounting.
13 Preventive Maintenance Checklist Proprietary and Confidential ©2024 Vertiv Group Corp. 103
Vertiv™ CoolPhase CDU Installer/User Guide

Table of Contents

Related product manuals