TABLE OF CONTENTS
1 Important Safety Instructions 1
2 Nomenclature and Components 9
2.1 Model Number Nomenclature 9
2.2 Component Location 12
2.2.1 Vertiv™ CoolPhase CDU 12
2.2.2 Determining Cooling Equipment Needs 14
2.3 Cooling Configuration 15
2.3.1 Vertiv™ CoolPhase CDU Minimum Load 19
3 Pre-installation Preparation and Guidelines 21
3.1 Site Preparation 22
3.2 Preparing a Concrete Slab 23
3.3 Planning Dimensions 23
3.4 Unit Weights 24
4 Equipment Inspection and Handling 25
4.1 Packaging Material 25
4.2 Storing Before Installation 26
4.3 Handling Units While Packaged 26
4.3.1 Recommended Unit Handling Equipment 26
4.4 Unpacking the Vertiv™ CoolPhase CDU Domestic Units 27
4.4.1 Shipping Bracket Removal, Lower Module 27
4.4.2 Unpacking/Removal of the Upper Module 28
4.4.3 Unpacking/Removal of the Lower Module 30
4.4.4 Removal 31
4.5 Placing the Unit on a Floorstand 32
4.5.1 Packaging Material 32
4.5.2 Floorstand Preparation 33
4.5.3 Floorstand Anchorage 33
4.5.4 Placing Unit onto Floorstand 34
4.5.5 Securing Unit to Floorstand 34
4.6 Installing the Unit without a Floorstand 35
4.6.1 Module Preparation for Attachment 36
4.6.2 Securing Unit to Concrete Slab Floor 38
4.6.3 Upper Module Placement onto Lower Module 39
4.6.4 Upper Module Attachment 41
5 Refrigerant Piping Requirements 45
5.1 Refrigerant Pipe Connection Sizes 46
5.2 Refrigerant Connection Locations 46
Proprietary and Confidential ©2024 Vertiv Group Corp. i
Vertiv™ CoolPhase CDU Installer/User Guide