EasyManua.ls Logo

Vertiv CoolPhase CDU - Storing before Installation; Handling Units While Packaged; Recommended Unit Handling Equipment

Vertiv CoolPhase CDU
157 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.2 Storing Before Installation
If storing the unit for long periods before installation:
Remove all packaging except unit bag. Clearance is to be maintained around the unit to prevent incidental
contact.
Inspect the unit periodically for condensation or other effects from the storage environment.
If storing at low temperatures, install electric heaters near the unit to prevent condensation.
4.3 Handling Units While Packaged
Transport the packaged unit using a fork lift.
When using a fork lift, make sure lift has adjustable forks. Forks are to be spread to widest allowable distance to
still fit under skid. Make sure fork length is suitable for skid length. Skid length is 128" (3251 mm).
When using a fork lift, unit shall not be lifted any higher than 2"-4" (51-102 mm) off ground when handled. All by-
standing personnel shall be no closer than 12' (3.7 m) to handled packaged unit.
If circumstances require unit to be lifted higher than 4" (10 2mm) great care shall be exercised, and all by-
standing personnel shall be no closer than 20' (5 m) to lift point of unit.
4.3.1 Recommended Unit Handling Equipment
Fork lift
Dolly carts
Spreader bars and slings
Chain hoists
Beam trolleys
Gantries
Figure 4.1 Recommended Unit Handling Equipment
26 Proprietary and Confidential ©2024 Vertiv Group Corp.
4 Equipment Inspection and
Handling
Vertiv™ CoolPhase CDU Installer/User Guide

Table of Contents

Related product manuals