7.9 Checklist for Completed Installation
1. Proper clearance for service access has been maintained around the equipment.
2. Equipment is level and mounting fasteners are tight.
3. Piping completed to refrigerant or coolant loop (if required). Refrigerant charge added (if
required).
4. Condensate pump installed (if required).
5. Drain line(s) connected and checked for leaks.
6. Water supply line connected to humidifier (if required). Route to allow air filter removal.
7. Field provided drain pan with drain installed under all cooling units and ceiling-mounted
water/glycol condensing units.
8. Filter box installed.
9. Ducting completed.
10. Filter(s) installed in return air duct.
11. Line voltage to power wiring matches equipment serial tag.
12. Power wiring connections completed between disconnect switch, evaporator and condensing
unit, including earth ground.
13. Power line circuit breakers or fuses have proper ratings for equipment installed.
14. Control wiring connections completed to evaporator and condensing unit (if required,
including wiring to wall-mounted control panel and optional controls).
15. Control panel DIP switches set based on customer requirements.
16. All wiring connections are tight.
17. Foreign materials have been removed from in and around all equipment installed (shipping
materials, construction materials, tools, etc.)
18. Fans and blowers rotate freely without unusual noise.
19. Inspect all piping connections for leaks during initial operations. Correct as needed.
20. Rubber band is removed from evaporator condensate pan float switch.
Vertiv | Liebert Mini-Mate25 ton User Manual| 54