EasyManua.ls Logo

Viessmann B1HF - Commissioning, Inspection, and Maintenance Procedures

Viessmann B1HF
116 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
Commissioning steps
Inspection steps
Maintenance steps Page
1. Commissioning the system............................................................................................... 32
2. Filling the heating system................................................................................................. 36
3. Checking all connections on the heating water and DHW sides for leaks................... 37
4. Venting the heating system............................................................................................... 37
5. Checking the gas type....................................................................................................... 38
6. Converting the gas type for operation with LPG............................................................. 38
7. Removing the front panel.................................................................................................. 39
8. Checking the static pressure and supply pressure........................................................ 40
9. Function sequence and possible faults........................................................................... 41
10. Setting the maximum heating output............................................................................... 42
11. Performing an actuator test.............................................................................................. 42
12. Adjusting pump rate of integral circulation pump.......................................................... 43
13. Activating screed drying................................................................................................... 44
14. Leak test on balanced flue system (annular gap check)................................................ 44
15. Burner adjustment when connecting multiple flues to a shared flue system.............. 45
16. Removing the burner......................................................................................................... 45
17. Checking the burner gasket and burner gauze assembly.............................................. 47
18. Checking and adjusting the ignition and ionisation electrodes.................................... 48
19. Checking the back draught safety devices...................................................................... 48
20. Cleaning the heating surfaces.......................................................................................... 49
21. Checking the condensate drain and cleaning the trap................................................... 50
22. Installing the burner........................................................................................................... 51
23. Checking the neutralising system (if installed)
24. Checking the flow limiter (only for gas condensing combi boiler)............................... 52
25. Checking the expansion vessel and system pressure................................................... 53
26. Checking the safety valve function
27. Checking the electrical connections for firm seating..................................................... 54
28. Checking all gas equipment for leaks at operating pressure........................................ 54
29. Fitting the front panel........................................................................................................ 54
30. Checking the combustion quality..................................................................................... 54
31. Checking the flue system for unrestricted flow and leaks
32. Checking the external LPG safety valve (if installed)
33. Matching the control unit to the heating system............................................................ 56
34. Adjusting the heating curves............................................................................................ 56
35. Instructing the system user.............................................................................................. 56
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
6167586

Table of Contents

Related product manuals