31
Commissioning steps
Inspection steps
Maintenance steps Page
•
1. Commissioning the system............................................................................................... 32
• •
2. Filling the heating system................................................................................................. 36
• • •
3. Checking all connections on the heating water and DHW sides for leaks................... 37
•
4. Venting the heating system............................................................................................... 37
•
5. Checking the gas type....................................................................................................... 38
•
6. Converting the gas type for operation with LPG............................................................. 38
• • •
7. Removing the front panel.................................................................................................. 39
• • •
8. Checking the static pressure and supply pressure........................................................ 40
•
9. Function sequence and possible faults........................................................................... 41
•
10. Setting the maximum heating output............................................................................... 42
• •
11. Performing an actuator test.............................................................................................. 42
•
12. Adjusting pump rate of integral circulation pump.......................................................... 43
•
13. Activating screed drying................................................................................................... 44
•
14. Leak test on balanced flue system (annular gap check)................................................ 44
•
15. Burner adjustment when connecting multiple flues to a shared flue system.............. 45
•
16. Removing the burner......................................................................................................... 45
• •
17. Checking the burner gasket and burner gauze assembly.............................................. 47
• •
18. Checking and adjusting the ignition and ionisation electrodes.................................... 48
• •
19. Checking the back draught safety devices...................................................................... 48
•
20. Cleaning the heating surfaces.......................................................................................... 49
• •
21. Checking the condensate drain and cleaning the trap................................................... 50
• •
22. Installing the burner........................................................................................................... 51
• •
23. Checking the neutralising system (if installed)
•
24. Checking the flow limiter (only for gas condensing combi boiler)............................... 52
• • •
25. Checking the expansion vessel and system pressure................................................... 53
• • •
26. Checking the safety valve function
• • •
27. Checking the electrical connections for firm seating..................................................... 54
• • •
28. Checking all gas equipment for leaks at operating pressure........................................ 54
• • •
29. Fitting the front panel........................................................................................................ 54
• •
30. Checking the combustion quality..................................................................................... 54
• • •
31. Checking the flue system for unrestricted flow and leaks
• • •
32. Checking the external LPG safety valve (if installed)
•
33. Matching the control unit to the heating system............................................................ 56
•
34. Adjusting the heating curves............................................................................................ 56
•
35. Instructing the system user.............................................................................................. 56
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance