5 INSTALLATION SITE REQUIREMENTS
5.1 Foundation, floor properties
The load-bearing capacity of the floor (or ceiling) must be examined by a statics expert commissioned
by the customer. If necessary, a foundation adapted to the conditions on site must be provided.
The area surrounding the machine must have an anti-slip floor, which is safe to walk on.
Make sure that the machine's performance cannot be impaired by other machine tools (e.g. due to vi-
bration).
5.2 Space requirement
Sufficient space must be available around the machine to ensure that there is no impairment to opera-
tion. Unhindered access to doors and covers during repairs and maintenance must also be guaran-
teed.