VWR CO2 Incubator Basic | 39
Operation
Preparing the device
The device must only be released for operation after all major measures for the start-up have
been taken (see Chapter 5 “Start-up”).
Prior to starting operation, the following device components must be checked for their correct
function:
Gas hoses must be seated tight on the connecting filter and must be secured using a hose
clamp.
The access port must be capped.
The pressure compensation opening must be permeable, its insert must be installed in the
work space.
The glass door seal must not be damaged.
The glass door measurement opening must be capped.
The shelf system components must be installed safely.
NOTE!
Hygiene regulations:
Prior to any operation, the user must clean and disinfect the work space in accordance with the
hygiene regulations set forth by the operator to protect the cultures.
Water supply:
The water tray of the work space can hold up to 3.0 l of processed water. When the running
operation, always keep a sufficient quantity of processed water of the following quality available:
Demineralized and distilled or autoclaved for sterilization
or
Completely deionized and distilled or autoclaved for sterilization
When the water level falls below the lower limit, refill water!