4
VERSION 01/2018
ORDER NUMBER DOC 2340851
Cobra 40-10 / 40-25
6.1 Training of Assembly/Commissioning Sta 25
6.2 Storage conditions 25
6.3 Installation conditions 25
6.4 Transportation 25
6.5 Assembly and installation 26
6.5.1 Ventilation of the spray booth 27
6.5.2 Air supply lines 27
6.5.3 Product supply lines 27
6.6 Grounding 27
6.7 Commissioning 29
7 OPERATION 30
7.1 Training the operating sta 30
7.2 EMERGENCY STOP 30
7.3 Work 31
7.4 Pressure Relief/Work Interruption 31
7.5 Basic cleaning 32
7.5.1 Filling with working material 32
8 CLEANING AND MAINTENANCE 33
8.1 Cleaning 33
8.1.1 Cleaning sta 33
8.1.2 Decommissioning and Cleaning 33
8.1.3 Long-term storage 33
8.2 Maintenance 34
8.2.1 Maintenance sta 34
8.2.2 Maintenance Instructions 34
8.2.3 Safety checks and maintenance intervals 35
8.2.4 Emptying pump 36
8.2.5 Filling the empty pump 37
8.2.6 Cleaning and Replacing the Filter 38
8.2.7 Maintenance Hydraulic Stage 40
8.2.8 Checking the Oil Level 40
8.2.9 Oil change 41
9 TROUBLESHOOTING AND RECTIFICATION 44
10 REPAIR WORK 45
10.1 Repair Sta 45
10.2 Repair Notes 45
10.3 Tools 45
10.4 Cleaning the parts after disassembly 46
10.5 Assembly of the Device 46
11 FUNCTION TEST AFTER THE REPAIR 47
12 DISPOSAL 48
13 ACCESSORIES 50
13.1 Cobra 40-10 Accessories 50
13.2 Cobra 40-25 Accessories 52
14 SPARE PARTS 54
14.1 How can spare parts be ordered? 54
14.2 Overview of the Cobra 40-10 Components 55
14.3 Cobra 40-10 Air Motor 56