EasyManua.ls Logo

Waters HPLC - Page 125

Default Icon
198 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Performance tests 3-41
To perform an external switch (S1 to S4) output test:
1. Attach a jumper wire from the S1 terminal to the INJ terminal on the
rear panel.
2. Press ENTER.
The screen displays
TEST PASSED or TEST FAILED.
3. Press ENTER.
4. Repeat steps 1 to 3 for the remaining switch terminals (S2 to S4).
5. When you have tested all four external switches, the screen displays
CONNECT HOLD TO INJECT.
Tip: If you want to perform the Hold Output test, do not press ENTER
until after you attach Hold to INJ. If you want to bypass the Hold
Output test, press ENTER.
Hold output test
To prevent further injections in case of power failure, the Hold switch outputs
a signal to devices that can recognize the signal, pressure shutdown, or an
abort procedure.
To perform a hold output test:
1. Attach a jumper wire from Hold to Gnd on the rear panel.
2. Press ENTER. The screen displays
TEST PASSED or TEST FAILED.
3. Press ENTER.
4. Remove the jumper wire.
5. Press ENTER.
Chart test
During this test, the Chart output ramps from 0 to 100% and then returns
suddenly to 0%.
To perform a chart test:
1. Connect the chart recorder to the Chart + and – terminals.
2. Set the recorder to accept a 10-mV full scale signal.

Table of Contents

Related product manuals