2-1
2 Installing the System
Contents
Topic Page
Setting up and inspecting 2-2
Electrical requirements 2-5
Assembling the system 2-7
Connecting a helium tank to the fluid handling unit 2-30
Setting up the plunger wash 2-33
Installing sample injection options 2-40
Connecting a fraction collector 2-42
Installing analytical and preparative columns 2-43
Making detector connections 2-48