EasyManua.ls Logo

Watson-Marlow qdos30 - Connecting Interface Tubing

Watson-Marlow qdos30
130 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6. Apply mains power to the pump, press start and run the pumphead for a few
revolutions.
7. Stop the pump and isolate it from the mains power supply, then tighten the clamps
further if necessary.
26.1 Connecting interface tubing
Note: Please refer to the diagram below in conjunction to the text when connecting
interface tubing to the pumphead.
Before connecting the interface tubing, ensure that the supplied Santoprene seals (1) are
correctly fitted in the head ports (1a) and that the Santoprene seals and connector
material is compatible with pumped fluid.
Hydraulic connector pack -
polypropylene barb/threaded ttings
Hydraulic connector pack -
PVDFbarb/threaded ttings
Hydraulic connector pack -
polypropylene compression ttings
m-qdos-en-02 115

Table of Contents

Other manuals for Watson-Marlow qdos30

Related product manuals