EasyManua.ls Logo

Western multiplex Lynx 2xE1 - Before Installation Task List

Default Icon
157 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION AND MAINTENANCE MANUAL
LYNX E1 FAMILY
LICENSED & SPREAD SPECTRUM RADIOS
JUNE 2001
PAGE 3-30 SECTION 3: INSTALLATION & ADJUSTMENTS
3.3 Before Installation Task List
There are several tasks that should be accomplished prior to installing the Lynx radio system. This
section briefly describes the following:
- Site selection
- Line-of-Sight and Path Clearance determination
- Anticipated RSL calculation
- Fade margin calculation
- Availability calculation
- Frequency plan determination
- Power supply planning
- Antenna (and accessories) purchase
Only directional antennas should be used with Lynx radios. These
can be grid or solid parabolic antennas (minimum 2 foot - .6
meter). Flat panel antennas are also acceptable if the beam width
is kept to a minimum.
3.3.1 Site Selection Requirements
The radio site must have:
- access to the appropriate power
- close proximity to the telephone or computer system you wish to interconnect
- line-of-sight to the other radio location with adequate clearance
- location for mounting the antenna

Table of Contents