Sawmill Assembly
Unpack the saw head
Sawmill Assembly WMdoc041521 3-7
3
See Figure 3-3.
3. Place the small bed section at the end of the designated area for the mill assembly.
IMPORTANT! Observe the direction of the
alignment pins in relation to the remaining bed
sections. Plan the assembly such that the log
supports are on the same side as the operator’s
station.
NOTE: Ensure the bed is assembled in the final
operating location. Once assembled, it should not be moved.
Unpack the saw head
1. Ensure all shipping restraints are removed prior to performing the next step.
2. Prepare a location for the mast to set down on blocks similar to the shipping blocks (ideal
size: 5-1/2 x 5-1/2 x 20”) prior to removing it from the transport crate.
WARNING! Use a fork lift, crane, or other lifting device to remove the
saw head from the packing crate. Failure to follow this may result in
serious injury or death.
3. Securely attach lifting straps to the top of the mast as shown in Figure 3-4.
CAUTION! Set the mast down ONLY on the prepared blocks. Setting it
on any other surface may result in major equipment damage.
FIG. 3-3
All nuts at the same level to aid in
assembly and leveling