WATER SYSTEMS & PIPEWORK
FILLING PRIMARY SEALED SYSTEMS:
• Filling the system must comply with one of
the methods shown opposite.
• The filling point must be at low level and must
never be a permanent direct fixing to the
mains water supply
.
• Filling loops must be WRAS approved.