FINISHING COMMISSIONING -
AP
PLIANCE
14 Pivot the control box (A) up and into the
boiler.
4 Secure with screws (B).
24Locate top edge of panel (C) onto the top
supporting ledge (D).
4Locate the ball stud connections (E) at the
base of the front panel and push
towards the boiler to secure.
3
4 Locate the top panel (F) onto the ball stud
connections (G) and press down to
secure.
Always apply pressure at the edges of the
boiler panels when securing to avoid
accidental damage.
Handover:
4Complete the Guarantee Registration Card,
C
ombustion Record (
page 50) and CD1
0 or
an equivalent commissioning form.
4Set up the controls and show the user how
to operate all the controls shown in the User
Guide and all system controls.
4Where applicable, instruct the customer how
to repressurise the system
.
4If the appliance is unused and exposed to
freezing conditions, shut off all the mains
supplies and drain the system and boiler
.
NOTE: Release drain point (H) to drain the
secondary heat exchanger
.
FINISHING COMMISSIONING -
APPLIANCE
I
N
S
T
ALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY KITCHEN 12/18-18/25-25/32
8 716 113 000a (01/07)
39