EasyManua.ls Logo

3D Systems DMP Flex 350 - Page 41

3D Systems DMP Flex 350
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3D Systems, Inc.
37
p/n: 15-D99, rev. C
Utilities and Equipment
Requirements
Atmosphere requirements completed
Refer to chapter 6
Electrical requirements completed
3 phase + N + GND electrical cable available (to be supplied
by customer)
400 VAC, 50/60 Hz, 3-phase power available
Measured values:________ VAC, ________ Hz, _______Phase
Transformer installed (if required)
Inert gas requirements completed
Compressed air requirements completed


Network Requirements
Computer and network requirements completed
Refer to chapter 7
3D connect requirements acknowledged (optional service)

Lifting Equipment

operator on site at the time of installation.
Refer to chapter 8
Comments
Signature

TRAVEL DUE TO FALSE OR INCORRECT INFORMATION ON THIS FORM.

Sales order number (S.O.)
Printer serial number

Table of Contents

Other manuals for 3D Systems DMP Flex 350

Related product manuals