EasyManua.ls Logo

ABB AO2000 Series - Fidas24: Connecting the Combustion Gas Line

ABB AO2000 Series
362 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
100 AO2000 CONTINUOUS GAS ANALYZERS | OI/AO2000-EN REV. B
Fidas24: Connecting the combustion gas line
Connecting the combustion gas line
Cleaning the combustion gas line
1 Pump cleaning agent (alkaline cleaner, stainless steel pickling agent)
through the stainless steel tube.
2 Thoroughly rinse the tube with distilled water.
3 Purge the tube for several hours at a temperature of > 100 °C with syn-
thetic air or with nitrogen (10 to 20 l/h).
4 Seal the ends of the tube.
Connecting the combustion gas line
5 Connect a two-stage cylinder pressure reducer (version for high purity
gases) to the combustion gas cylinder.
6 Connect the combustion gas line to the cylinder pressure reducer.
7 Install a flow restrictor in the combustion gas supply line which restricts
the combustion gas flow to 10 l/h of H
2
or 25 l/h of H
2
/He mixture. This
means that operation of the gas analyzer is safe even with a defect in
the combustion gas feed path (e.g. leaks).
8 Install a shut-off valve in the combustion gas supply line. It is recom-
mended that a pneumatic valve is installed; this valve must be controlled
by the instrument air supply in such a way that the combustion gas feed
is automatically shut off if the instrument air supply fails (see page 335)
(and the continuous housing purge therefore fails).
9 Connect (see page 83) the combustion gas line to the combustion gas
inlet of the analyzer module via a pressure regulator (0 to 1.6 bar).
Check the seal integrity of the combustion gas line
10 Check (see page 283) the seal integrity of the combustion gas line after
connection.

Table of Contents

Related product manuals