EasyManua.ls Logo

ABB AO2000 Series - Preparation for Installation; Scope of Supply and Delivery

ABB AO2000 Series
362 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34 AO2000 CONTINUOUS GAS ANALYZERS | OI/AO2000-EN REV. B
Preparation for installation
Scope of supply and delivery
Standard scope of supply and delivery
Gas analyzer Model AO2020 (19-inch housing) or Model AO2040
(wall-mount housing)
Screwed fittings with tubing connectors for the connection of flexible
tubes
Mains lead, length 5 m, grounded-instrument connector and separate
grounding connector
Mating plugs (socket housing) for the electrical connection of the
I/O modules (plugged on the I/O modules)
Screwdriver (required for attaching the electric lines in the mating plugs)
System bus terminating resistor
DVD-ROM "Software tools and technical documentation" with software
tools and technical documentation
Commissioning instruction
Analyzer Data Sheet
Also in the scope of supply and delivery depending on version
Connecting cable for the 24 V DC supply to analyzer modules which are
not installed in the central unit
Connecting cable, T-pieces and terminating resistors for the system bus
(according to order)
Inserts for the M32 screwed cable glands (only IP54 version)
Fidas24:
Mains lead, length 5 m, with 4-pin socket connector and separate
grounding connector for the power supply to the heating of the detector
and the heated sample gas connection
Accessories pack with fittings and O-rings for connection of the sample
gas line
Exhaust pipe with fitting nut and compression fitting

Table of Contents

Related product manuals